South Dakota EV charging

EV charging stations in South Dakota

28 public charging locations and 110 ports mapped across 18 South Dakota communities, including 10 DC fast-charging sites.

Networks in South Dakota

  • Tesla11
  • Electrify America5
  • Independent4
  • ChargePoint2
  • Red E2
  • ClipperCreek1
  • EV Connect1
  • Ford Motor Company1
  • EVgo1

Connector availability

  • NACS (Tesla)10 locations
  • CCS110 locations
  • J17723 locations
  • CHAdeMO2 locations

Charging by city

CityLocationsDC fastPorts
Rapid City519
Crooks314
Mitchell2112
Custer2010
Watertown208
Sioux Falls2111
Murdo104
Wall108
Spearfish106
Oacoma108
Sisseton108
Deadwood100
Chamberlain116
Dakota Dunes116
Philip114
Brookings112
Pierre112
Mobridge112

Home charging incentives in South Dakota

  • Federal §30C Alternative Fuel Credit (ended) — No longer available for new installs. §30C was terminated for charging equipment placed in service after June 30, 2026. State and utility programs below are now the main incentives.
  • Check your local utility — Varies. Most investor-owned utilities now offer at least a Level 2 install rebate or off-peak EV rate. Search DOE AFDC for current programs.

Program funding and terms change frequently — confirm availability with the program administrator before purchasing equipment.

Electricians in South Dakota

All South Dakota EV installers →

FAQs

How many EV charging stations are in South Dakota?

WireCircuitPro maps 28 public charging locations in South Dakota from OpenStreetMap data, 10 of which offer DC fast charging. Community-mapped data can lag new openings.

Do I need a permit to install a home EV charger in South Dakota?

Yes — a new 240V EV charger circuit needs an electrical permit and inspection in virtually every South Dakota jurisdiction. Permits are pulled at the local building department; a licensed electrician of record is required for service-level work.

Are there EV charger rebates in South Dakota?

Incentives change often. Check your electric utility's EV programs and South Dakota's energy office. The federal 30C home-charger credit ended for equipment placed in service after June 30, 2026.

Station data: © OpenStreetMap contributors, ODbL 1.0 (https://www.openstreetmap.org/copyright). Snapshot 2026-10-15.

Emergency Dispatch