Wisconsin EV charging
EV charging stations in Wisconsin
248 public charging locations and 835 ports mapped across 108 Wisconsin communities, including 70 DC fast-charging sites.
Networks in Wisconsin
- Independent78
- Tesla45
- ChargePoint39
- Kwik Charge16
- Electrify America9
- Ford Motor Company7
- EVgo5
- Francis Energy5
- Kwik Trip3
- Clipper Creek3
Connector availability
- CCS169 locations
- NACS (Tesla)59 locations
- J177251 locations
- CHAdeMO15 locations
Charging by city
| City | Locations | DC fast | Ports |
|---|---|---|---|
| Middleton | 17 | 2 | 27 |
| Madison | 17 | 0 | 40 |
| Windsor | 16 | 1 | 30 |
| Stevens Point | 9 | 1 | 19 |
| Shorewood Hills | 7 | 0 | 10 |
| Monona | 6 | 0 | 13 |
| Sun Prairie | 5 | 1 | 22 |
| Milwaukee | 5 | 0 | 3 |
| Lake Delton | 5 | 0 | 16 |
| North Fond du Lac | 5 | 2 | 11 |
| Little Round Lake | 5 | 0 | 7 |
| Fitchburg | 4 | 0 | 19 |
| Hudson | 4 | 1 | 10 |
| Tomah | 4 | 2 | 14 |
| Janesville | 4 | 3 | 44 |
| Saint Francis | 3 | 2 | 10 |
| Greendale | 3 | 2 | 13 |
| Oshkosh | 3 | 2 | 12 |
| Verona | 3 | 0 | 6 |
| Wisconsin Dells | 3 | 0 | 15 |
| Sturgeon Bay | 3 | 0 | 12 |
| Marinette | 3 | 1 | 12 |
| Beaver Dam | 3 | 2 | 4 |
| Ashland | 3 | 0 | 0 |
| Pleasant Prairie | 3 | 1 | 16 |
| Black River Falls | 3 | 1 | 20 |
| Oak Creek | 2 | 0 | 16 |
| Howard | 2 | 1 | 14 |
| Wausau | 2 | 1 | 12 |
| Onalaska | 2 | 0 | 6 |
| La Crosse | 2 | 0 | 1 |
| Menomonie | 2 | 1 | 12 |
| Mauston | 2 | 1 | 10 |
| Appleton | 2 | 0 | 8 |
| Franksville | 2 | 1 | 16 |
| Glendale | 2 | 1 | 14 |
| West Baraboo | 2 | 0 | 2 |
| Hales Corners | 2 | 1 | 4 |
| Johnson Creek | 2 | 2 | 12 |
| Williams Bay | 2 | 0 | 4 |
Home charging incentives in Wisconsin
- Federal §30C Alternative Fuel Credit (ended) — No longer available for new installs. §30C was terminated for charging equipment placed in service after June 30, 2026. State and utility programs below are now the main incentives.
- Check your local utility — Varies. Most investor-owned utilities now offer at least a Level 2 install rebate or off-peak EV rate. Search DOE AFDC for current programs.
Program funding and terms change frequently — confirm availability with the program administrator before purchasing equipment.
Electricians in Wisconsin
All Wisconsin EV installers →B&B Electric Inc.
Electrical contractor in Rice Lake, WI
Beranek Electric and Mechanical
Industrial contractor in Rice Lake, WI
Colburn Electric
Electrical contractor in Kenosha, WI
Edge Electric
Electrical contractor in Pewaukee, WI
Hubbart Electric
Electrical contractor in Manitowoc, WI
Hubbartt Electric
Electrical contractor in Manitowoc, WI
FAQs
How many EV charging stations are in Wisconsin?
WireCircuitPro maps 248 public charging locations in Wisconsin from OpenStreetMap data, 70 of which offer DC fast charging. Community-mapped data can lag new openings.
Do I need a permit to install a home EV charger in Wisconsin?
Yes — a new 240V EV charger circuit needs an electrical permit and inspection in virtually every Wisconsin jurisdiction. Permits are pulled at the local building department; a licensed electrician of record is required for service-level work.
Are there EV charger rebates in Wisconsin?
Incentives change often. Check your electric utility's EV programs and Wisconsin's energy office. The federal 30C home-charger credit ended for equipment placed in service after June 30, 2026.
Station data: © OpenStreetMap contributors, ODbL 1.0 (https://www.openstreetmap.org/copyright). Snapshot 2026-10-15.