Tenant Fit-Out Electrical: Scope, Schedule & Pitfalls

In a fit-out, electrical touches nearly every other trade. Getting it right early prevents costly rework.

Updated 2026-10-15

Start with existing conditions

Survey the base-building panel capacity, metering, emergency lighting, fire alarm, and any abandoned wiring. Landlord work letters often specify what the base building provides and what the tenant pays for.

Design considerations

Typical scope items:

  • Lighting and energy-code controls (occupancy, daylight, scheduling)
  • Receptacle and data layouts by workstation plan
  • Dedicated circuits for kitchens, IT rooms, and equipment
  • Emergency and exit lighting
  • Fire alarm device relocation
  • Signage power and storefront lighting

Schedule realities

Electrical rough-in follows framing and precedes drywall; trim follows ceilings. Long-lead items — panels, switchgear, specialty fixtures — can drive the schedule, so order early.

Find a pro

Compare commercial & industrial specialists

Frequently asked questions

Who pays for electrical in a lease buildout?

It depends on the lease and work letter. Clarify base-building vs tenant responsibilities before signing.

Do we need stamped drawings?

Most jurisdictions require engineered drawings for commercial permits beyond minor work.

How long does fit-out electrical take?

Small suites can take a few weeks of electrical work; larger fit-outs track the overall construction schedule over months.

Back to the commercial & industrial guide

More in Commercial & Industrial

This guide is general information, not engineering or legal advice. Electrical codes are adopted and amended locally — consult a licensed electrician and your local building department for your project.